ТеплоВиКEngineering systems

Home/Heating

◆Service 01 · Heating

Turnkey heating — from heat-loss calculation to commissioning

We calculate the hydraulics, design the system, build the boiler room and the pipework, commission it and service it. One contractor for every stage — one party answerable for the result.

+998 97 407 99 29
Boiler wall in the TeploViK showroom, Tashkent

What the work covers

six parts, one responsibility
01

Heat-loss calculation

Room by room: walls, glazing, orientation, air change rate. Boiler output, pipe diameters and loop spacing all come from this figure — everything else rests on it.

02

Design

Schematic, axonometric drawing, bill of materials, node details. A document you can build from, check against and service ten years later.

03

Boiler room

Boiler, low-loss header, manifold, pump groups, expansion vessels, controls. Assembled on site or built as a module in our workshop and delivered ready.

04

Pipework

Radiator and manifold circuits, multilayer or copper, concealed in the screed. Every circuit is pressure-tested separately and labelled.

05

Underfloor heating

Loop spacing and length matched to the floor finish and the furniture plan, manifold cabinet, mixing unit, flow meters set zone by zone.

06

Commissioning and service

Circuit balancing, weather compensation curve, operator training, scheduled maintenance by our own service department.

How the boiler room works

schematic, circuit running

The schematic on the right is built the way a real boiler room is. The boiler is connected from below: flow and return drop down, run across to the low-loss header and are decoupled there.

A low-loss header earns its place as soon as there is more than one circuit. The boiler pump and the circuit pumps run at different flow rates; without decoupling, one circuit steals flow from another and the boiler starts short-cycling.

Two circuits leave the header. The radiator circuit runs directly, at boiler temperature. The underfloor circuit runs through a mixing unit: blending in return water brings the temperature down to 35–45 °C, otherwise the screed cracks and the floor becomes unpleasant to walk on.

The expansion vessel takes up the water as it heats. Its volume is calculated, not guessed: undersize it and the relief valve dumps pressure, oversize it and you have paid for nothing.

0102РО04ТП070508030670,0 °C50,2 °C68,5 °C55,0 °C41,8 °CDesign mode · −15 °C01  Boiler02  Low-loss header03  Radiator pump04  Radiators05  Underfloor mixing unit06  Underfloor pump07  Underfloor heating08  Expansion vessel

Equipment

we are the official representative of these brands in Uzbekistan
NodeBrands
BoilersAriston · Termet · Chaffoteaux
Manifolds, balancing, temperature controlHERZ
PumpsGrundfos
Radiators and convectorsZehnder · Kampmann
Pipes and fittingsViega · Pilsa · Carlo Poletti
Expansion vesselsZilmet
Controls and thermostatsENGO
Water treatment for the boiler circuitBWT

How the job runs

from the first call to handover
  1. 01Enquiry and site visitWe look at the building, take measurements and listen to the brief.1–2 days
  2. 02Calculation and proposalHeat losses, equipment selection, an itemised quotation.3–5 days
  3. 03DesignSchematic, axonometric, specification, node details. Agreed and frozen.5–10 days
  4. 04Supply and installationEquipment from our own stock, boiler room and pipework, every circuit pressure-tested.from 2 weeks
  5. 05Commissioning and handoverBalancing, controls set up, operator briefing, warranty and a service schedule.2–3 days

Where it already runs

residential complexes and buildings across Tashkent and the region
TeploViK project: NEST ONE, Tashkent
NEST ONE
TeploViK project: Mirabad Avenue, Tashkent
Mirabad Avenue
TeploViK project: Modera Towers, Tashkent
Modera Towers
TeploViK project: Infinity Residence, Tashkent
Infinity Residence
TeploViK project: WIST, Tashkent
WIST
TeploViK project: Golden House, Tashkent
Golden House
TeploViK project: Boulevard, Tashkent
Boulevard
TeploViK project: Gardens Residence, Tashkent
Gardens Residence
TeploViK project: Kazakhstan Residence, Tashkent
Kazakhstan Residence
TeploViK project: NEST ONE, Tashkent
NEST ONE
TeploViK project: Mirabad Avenue, Tashkent
Mirabad Avenue
TeploViK project: Modera Towers, Tashkent
Modera Towers
TeploViK project: Infinity Residence, Tashkent
Infinity Residence
TeploViK project: WIST, Tashkent
WIST
TeploViK project: Golden House, Tashkent
Golden House
TeploViK project: Boulevard, Tashkent
Boulevard
TeploViK project: Gardens Residence, Tashkent
Gardens Residence
TeploViK project: Kazakhstan Residence, Tashkent
Kazakhstan Residence
TeploViK project: Anhor Residence, Tashkent
Anhor Residence
TeploViK project: First Village, Tashkent
First Village
TeploViK project: NRG Park, Tashkent
NRG Park
TeploViK project: NRG Hayot, Tashkent
NRG Hayot
TeploViK project: NRG Oybek, Tashkent
NRG Oybek
TeploViK project: Kislorod, Tashkent
Kislorod
TeploViK project: Onyx Business Center, Tashkent
Onyx Business Center
TeploViK project: Minor Mosque, Tashkent
Minor Mosque
TeploViK project: Grohe Showroom, Tashkent
Grohe Showroom
TeploViK project: Anhor Residence, Tashkent
Anhor Residence
TeploViK project: First Village, Tashkent
First Village
TeploViK project: NRG Park, Tashkent
NRG Park
TeploViK project: NRG Hayot, Tashkent
NRG Hayot
TeploViK project: NRG Oybek, Tashkent
NRG Oybek
TeploViK project: Kislorod, Tashkent
Kislorod
TeploViK project: Onyx Business Center, Tashkent
Onyx Business Center
TeploViK project: Minor Mosque, Tashkent
Minor Mosque
TeploViK project: Grohe Showroom, Tashkent
Grohe Showroom

Questions people ask before the calculation

short and to the point
What does heating cost for a 200 m² house?

The price has three parts: equipment, pipework materials and labour. The gap between “a boiler and radiators” and “a boiler room with weather compensation, underfloor heating and a cylinder” is threefold — quoting a single number would not be honest.

The calculation is free: after a site visit and a heat-loss calculation you get an itemised quotation and can strike anything out of it.

Why not size the system at 100 watts per square metre?

That rule of thumb cannot see the glazing, the orientation, the wall build-up or the ceiling height. With full-height glazing it understates the load by half; on a well-insulated house it overstates it by as much.

Both errors cost money. An undersized boiler will not carry January; an oversized one short-cycles, wears out the heat exchanger and burns extra gas.

Do I need a low-loss header in a house?

With a single circuit, no — it only adds cost. With two or more circuits running at different flow rates and temperatures, yes.

Without decoupling, the pumps work against each other: the underfloor circuit pulls flow away from the radiators, and the boiler sees an inflated return temperature and cycles.

Radiators or underfloor heating?

Usually both. The floor holds the base temperature and reacts slowly; a radiator under the window cuts the downdraught from the glass and responds within minutes.

Underfloor heating alone in a house with full-height glazing is a common mistake: the room warms up, but the cold still falls at the glass.

What about warranty and servicing?

Equipment carries the manufacturer warranty — we are the official representative, so a claim is settled here rather than by letters to Europe.

The installation carries our own warranty. Servicing is done by our own department, not by an outside contractor.

Do you work on houses that are already built?

Yes. In a finished house the pipework runs exposed or in casings, and where the floor height does not allow a wet screed we use dry underfloor systems.

A frequent job in its own right: rebuilding a boiler room that was assembled without a calculation. We replace the pipework and controls and keep the equipment wherever we can.

Let us size your project

Send the floor area and the plan — we will come back with a heat-loss calculation and a quotation. The calculation is free and commits you to nothing.

+998 97 407 99 29