ТеплоВиКEngineering systems

Home/Ventilation

Turnkey ventilation

From the air change calculation to balancing: network design, the unit, ductwork and scheduled service.

TeploViK engineering systems showroom, Tashkent

What the work covers

01

Air change calculation

By occupancy, by floor area and by room function, whichever gives the higher figure. A bedroom, a kitchen and a meeting room each need something different; one number for the whole building always short-changes someone.

02

Network design

Routing, diameters, aerodynamic calculation, penetration details. With that drawing the installation does not run into a beam halfway along the route.

03

Supply and extract unit

Selected on flow and pressure with headroom for filter loading. Heat exchanger, heater, filtration, controls.

04

Ductwork

Galvanised steel or plastic, silencers, anti-vibration connections, insulation wherever condensation forms. Concealed above the ceiling with access hatches.

05

Air distribution

Grilles and diffusers placed so nothing blows on the back of your neck. Outlet velocity kept below the point where the airflow becomes audible.

06

Balancing and service

Flow measured on every branch, regulators set, a filter replacement schedule. Without measurement, ventilation does not run the way the drawing says.

Why heat recovery pays for itself in Tashkent

Tashkent sees +42 in summer and around −10 in winter. A supply unit without heat recovery carries that whole difference on its heater and on the air conditioner, which is to say, on the electricity bill.

A heat exchanger takes the heat out of the air you are throwing away anyway and gives it to the incoming air. In winter the supply arrives at around +16 rather than −10, so there is almost nothing left to heat.

In summer it works the same way in reverse: hot outdoor air gives up part of its heat to the extract and arrives already cooled, taking load off the air conditioning.

The second argument is dust. Indoor dust comes in through the open window. A supply unit with a filter closes that window for good: fresh air, no dust.

The TeploViK showroom hall with engineering equipment

Equipment

ElementWhat we install
Supply and extract units with heat recoveryZehnder
Fan convectors and air curtainsKampmann
Ductwork and fittingsfabricated to the design
Grilles, diffusers, flow regulatorsselected for the distribution
Silencers and anti-vibrationto the acoustic calculation
Controls and thermostatsENGO

We are the official representative of these brands in Uzbekistan: warranty and spare parts go through us.

How the job runs

  1. 011-2 daysEnquiry and site visitWe look at the building, the ceiling void available, and listen to the brief.
  2. 023-5 daysCalculation and proposalAir change rates, unit selection, an itemised quotation.
  3. 035-10 daysDesignRouting, diameters, aerodynamics, details. Agreed and frozen.
  4. 04from 2 weeksSupply and installationUnit, ductwork, silencers, terminals. Concealed work recorded as it goes.
  5. 052-3 daysBalancing and handoverFlow measurement, regulators set, operator briefing, service schedule.

Where it already runs

TeploViK project: NEST ONE, Tashkent
NEST ONE
TeploViK project: Mirabad Avenue, Tashkent
Mirabad Avenue
TeploViK project: Modera Towers, Tashkent
Modera Towers
TeploViK project: Infinity Residence, Tashkent
Infinity Residence
TeploViK project: WIST, Tashkent
WIST
TeploViK project: Golden House, Tashkent
Golden House
TeploViK project: Boulevard, Tashkent
Boulevard
TeploViK project: Gardens Residence, Tashkent
Gardens Residence
TeploViK project: Kazakhstan Residence, Tashkent
Kazakhstan Residence
TeploViK project: Anhor Residence, Tashkent
Anhor Residence
TeploViK project: First Village, Tashkent
First Village
TeploViK project: NRG Park, Tashkent
NRG Park
TeploViK project: NRG Hayot, Tashkent
NRG Hayot
TeploViK project: NRG Oybek, Tashkent
NRG Oybek
TeploViK project: Kislorod, Tashkent
Kislorod
TeploViK project: Onyx Business Center, Tashkent
Onyx Business Center
TeploViK project: Minor Mosque, Tashkent
Minor Mosque
TeploViK project: Grohe Showroom, Tashkent
Grohe Showroom
TeploViK project: NEST ONE, Tashkent
NEST ONE
TeploViK project: Mirabad Avenue, Tashkent
Mirabad Avenue
TeploViK project: Modera Towers, Tashkent
Modera Towers
TeploViK project: Infinity Residence, Tashkent
Infinity Residence
TeploViK project: WIST, Tashkent
WIST
TeploViK project: Golden House, Tashkent
Golden House
TeploViK project: Boulevard, Tashkent
Boulevard
TeploViK project: Gardens Residence, Tashkent
Gardens Residence
TeploViK project: Kazakhstan Residence, Tashkent
Kazakhstan Residence
TeploViK project: Anhor Residence, Tashkent
Anhor Residence
TeploViK project: First Village, Tashkent
First Village
TeploViK project: NRG Park, Tashkent
NRG Park
TeploViK project: NRG Hayot, Tashkent
NRG Hayot
TeploViK project: NRG Oybek, Tashkent
NRG Oybek
TeploViK project: Kislorod, Tashkent
Kislorod
TeploViK project: Onyx Business Center, Tashkent
Onyx Business Center
TeploViK project: Minor Mosque, Tashkent
Minor Mosque
TeploViK project: Grohe Showroom, Tashkent
Grohe Showroom

Questions people ask before the calculation

Can ventilation be added to a finished apartment?

Yes. A ducted unit hides above the ceiling in the hallway and bathrooms; that costs 20-25 cm of height there, while the living rooms keep their ceiling.

Where there is no height at all, we use single-room supply units, one per room, discharging through the wall.

Is a supply unit noisy?

What you usually hear is not the unit but the velocity in the ducts. Undersize the cross-section to save money and the air whistles at the grilles, and that cannot be fixed afterwards.

We keep velocities sensible, fit silencers downstream of the unit and isolate it from the structure with anti-vibration connections.

Is heat recovery essential, or is extract enough?

Extract on its own puts the apartment under negative pressure, and air arrives from places nobody invited it from: the stairwell, the neighbour’s bathroom, the shaft.

Supply has to be organised. In that scheme the heat recovery unit returns heat you have already paid for.

How often do filters need changing?

In Tashkent, more often than the manufacturer states, because of the dust. Take 3-6 months as the reference for the supply filter.

The pressure drop is a better guide: a unit with a sensor will tell you itself when the filter is loaded.

Are ventilation and air conditioning the same thing?

No. An air conditioner recirculates the same air and changes its temperature. It adds no freshness.

Ventilation replaces the air. Stuffiness in a room with the air conditioner running is exactly that difference.

Let us calculate the air change for your building

Send the plan and what each room is for, and we will come back with the calculation and a unit selection. It is free and commits you to nothing.